wellbore cleanout tools

Wellbore Cleanout and De-burring Operations – A Proposal Program

GENERAL INFO There are 5 gas zones reservoir inside 9 5/8” casing sections that will be completed with MST single trip multi-zone sand control which is equipped with single selective production equipment. All GP zones will be treated either with HRWP or circulation pack treatment. The pumping services will be performed by utilizing pumping skids

Read More 

Well Displacement – Oil Well Pre-Completion

Introduction Once the well is drilled to TD, it should be displaced to a clean, solids-free completion fluid before commencing with the completion. During the transition from drilling mud to completion fluid, the fate of the well is very often determined since it is estimated that a third of all failed completions are due to

Read More 

Wellbore Clean Out Services Program for Tangguh Integrated Drilling Program – a Proposal

Technical Proposal/Program – 9-7/8” Compression Set Service Packers in Conjunction with Wellbore Cleanout Equipment and Negative Test on 7” Liner Remarks: Example Program/Proposal Rev Date Modification Details Written By 0 01/25/2017 R0 Dan Imansyah Section 1.0 Introduction The following program is an example of the programs submitted to clients as part of the pre job

Read More